Opens in a new tab

How Much Does a Restaurant Renovation Cost in Vancouver?

October 5, 2026

Most restaurant owners ask the same first question: what will this actually cost? The honest answer is a range, and the range is wide because two restaurants of the same size can need very different work behind the walls. This guide breaks down restaurant renovation cost in Vancouver for owners who are renovating an existing restaurant or converting a space that already has some food service history.

You will find typical 2026 cost per square foot by restaurant type, three worked example budgets, a section on each major cost driver, and a simple estimator you can use to sanity-check your own numbers. If you already have a space in mind, our team offers restaurant renovation in Vancouver with a free site visit and a detailed, line-by-line estimate.

Key takeaways

  • Typical Vancouver restaurant renovations run about $150 to $500 per square foot in 2026, with fine dining at $500 to $800+.
  • Mid-market sit-down restaurants usually land around $250 to $350 per square foot.
  • The kitchen zone costs far more per square foot ($400 to $700) than the dining room ($150 to $300).
  • A new Type I hood system with grease duct, make-up air and suppression can add $30,000 to $80,000 on its own.
  • Reusing a working hood, grease interceptor and washrooms in a second-generation space can save tens of thousands of dollars.
  • Budget a 10 to 15% contingency. Older Vancouver buildings almost always hide something.

Restaurant renovation cost per square foot by restaurant type

The table below shows typical Vancouver market ranges (2026) by concept. These numbers cover construction: demolition, mechanical, electrical and plumbing, kitchen ventilation, finishes, washrooms, permits and design. Kitchen equipment itself is usually a separate budget.

Restaurant type Typical cost per sq ft What drives the range
Quick-service / takeout $150 to $320 Whether a new hood and cooking line are needed; counter and millwork quality
Fast casual $150 to $300 Open kitchen visibility, seating count, branded finishes
Casual sit-down $200 to $350 Kitchen size, washroom count, dining room finishes
Full-service with bar $250 to $500 Bar build, larger kitchen, HVAC capacity, custom millwork
Fine dining $500 to $800+ Premium materials, acoustic work, lighting design, custom everything
Light cosmetic refresh (no kitchen or mechanical changes) $75 to $120 Paint, flooring, lighting, minor millwork

Typical 2026 Vancouver market estimates, before GST. Not a quote. Final numbers depend on the space; we provide a free site visit and detailed estimate.

Within a single restaurant, cost is not spread evenly. A commercial kitchen zone can run $400 to $700 per square foot, while the dining room often sits at $150 to $300. That is why a restaurant with a large kitchen relative to its seating area costs more per square foot overall, even with modest dining room finishes.

Three example restaurant renovation budgets

The examples below are hypothetical. They are not Suzuki projects, and they are meant to show how the line items add up, not to price your space. Each includes a 10% contingency.

Example 1: 900 sq ft takeout refresh in a second-generation space

Say you take over a 900 sq ft takeout shop in Kitsilano that was already a pizza counter. The hood, grease interceptor and washroom exist and work. You keep the kitchen layout, update the suppression system, add a new service counter and refresh the finishes.

Line item Low High
Demolition and disposal $9,000 $18,000
Electrical updates (lighting, circuits for new equipment) $12,000 $25,000
Plumbing (sink changes, reuse existing interceptor) $8,000 $18,000
HVAC adjustments and balancing $8,000 $20,000
Hood service and fire suppression update $8,000 $18,000
Service counter and millwork $15,000 $35,000
Finishes (flooring, walls, ceiling, lighting fixtures) $25,000 $55,000
Washroom upgrade (one accessible washroom) $12,000 $25,000
Design, engineering and permits $8,000 $15,000
General conditions and supervision $10,000 $20,000
Subtotal $115,000 $249,000
Contingency (10%) $11,500 $24,900
Total $126,500 $273,900

Hypothetical example. Typical 2026 Vancouver market estimates, before GST. Not a quote.

That works out to roughly $140 to $305 per square foot. The low end is only possible because the expensive systems already exist. If the hood had to be replaced, the budget would jump quickly.

Example 2: 1,500 sq ft casual sit-down, second-generation conversion

Now say you lease a 1,500 sq ft former cafe on Main Street and want to turn it into a casual sit-down restaurant with a full cooking line. The cafe had no Type I hood, and its grease interceptor is too small for the new fixture load. You keep the basic electrical service and the washroom locations, but rebuild both washrooms to accessible standards.

Line item Low High
Demolition ($15 to $20 per sq ft) $22,500 $30,000
Electrical (new circuits, panel work, lighting) $30,000 $50,000
Plumbing (kitchen sinks, floor drains, rough-ins) $25,000 $40,000
New grease interceptor, installed $5,000 $15,000
HVAC and make-up air $25,000 $50,000
Type I hood, grease duct and fire suppression $30,000 $70,000
Kitchen equipment hookups (gas, power, water) $10,000 $15,000
Two accessible washrooms $25,000 $45,000
Dining room finishes (flooring, ceiling, lighting, feature wall, banquettes) $60,000 $90,000
Service counter and bar millwork $15,000 $30,000
Design, engineering and permits $15,000 $25,000
General conditions and supervision $20,000 $30,000
Subtotal $282,500 $490,000
Contingency (10%) $28,250 $49,000
Total $310,750 $539,000

Hypothetical example. Typical 2026 Vancouver market estimates, before GST. Not a quote.

That is roughly $207 to $359 per square foot, right in the casual sit-down range. Notice that the hood system, HVAC and washrooms together account for close to a third of the subtotal. Those are the items to verify before you sign a lease.

Example 3: 2,500 sq ft full-service restaurant with bar

Finally, say you convert a 2,500 sq ft former retail store in Yaletown into a full-service restaurant with a bar. There is no kitchen infrastructure at all. The electrical service needs an upgrade, the slab must be trenched for floor drains, and the sprinkler heads need to be modified for the new layout. A change of use like this also typically requires a development permit.

Line item Low High
Demolition ($10 to $30 per sq ft) $25,000 $75,000
Electrical service upgrade and distribution $75,000 $130,000
Plumbing, slab trenching and floor drains $60,000 $120,000
Grease interceptor, installed $8,000 $18,000
HVAC and make-up air $60,000 $100,000
Type I hood, grease duct and fire suppression $45,000 $80,000
Kitchen equipment and walk-in cooler hookups $20,000 $40,000
Bar build (millwork, bar sinks, rough-ins) $50,000 $90,000
Two accessible washrooms $30,000 $50,000
Dining room finishes, lighting and custom millwork $150,000 $250,000
Sprinkler and fire alarm modifications $15,000 $40,000
Design, engineering and permits $35,000 $70,000
General conditions and supervision $45,000 $75,000
Subtotal $618,000 $1,138,000
Contingency (10%) $61,800 $113,800
Total $679,800 $1,251,800

Hypothetical example. Typical 2026 Vancouver market estimates, before GST. Not a quote.

That is about $272 to $500 per square foot.

What drives restaurant renovation cost in Vancouver

Every budget above is built from the same handful of cost drivers. Understanding each one helps you see where your money goes and where you have real choices.

Demolition

Demolition typically runs $10 to $30 per square foot. The low end is a straightforward strip of finishes and fixtures. The high end covers removing old kitchen equipment, cutting concrete, hauling heavy debris and dealing with surprises behind walls.

In older buildings, plan for the possibility of hazardous materials such as asbestos in old flooring or drywall compound. Testing before demolition protects your schedule and your crew.

Electrical

Restaurants draw far more power than retail or office space. Fryers, ovens, dishwashers, refrigeration and HVAC all add load. If the existing electrical service cannot handle it, a service upgrade can become one of the largest single items in the budget.

Across a typical restaurant, electrical, plumbing and HVAC together run about $50 to $100 per square foot. Before you commit to a layout, have someone confirm the panel capacity and the available service from the utility.

Plumbing and grease interceptor

Restaurant plumbing includes hand sinks, prep sinks, three-compartment sinks, floor drains, dishwasher connections and washroom fixtures. Moving fixtures away from existing drain lines usually means cutting and trenching the concrete slab, which adds cost fast.

A grease interceptor installed typically costs $5,000 to $18,000. Under the Metro Vancouver Food Sector Grease Interceptor Bylaw No. 365, the interceptor must be sized to your fixture flow, cleaned at least every 90 days (or when grease reaches 25% of its depth), and in buildings built or converted to food use after the bylaw was adopted, dishwashers must connect to it. Operating without one carries a minimum $2,000 fine.

HVAC and make-up air

When a kitchen hood exhausts air, that air has to be replaced. That is the job of make-up air. For a casual restaurant around 1,200 sq ft, HVAC and make-up air commonly run $20,000 to $50,000.

Equipment lead times matter as much as price. HVAC units can take 6 to 12 weeks to arrive, which is one of the most common causes of restaurant opening delays. Ordering early, once drawings are confirmed, protects your opening date.

Commercial kitchen: hood, suppression and equipment hookups

The kitchen ventilation system is often the biggest swing item in a restaurant budget. A Type I hood with fire suppression typically costs $18,000 to $45,000. A complete system including hood, grease duct, make-up air and suppression runs $30,000 to $80,000 installed. A fire suppression system on its own (Ansul-type) is roughly $8,000 to $18,000.

The duct route matters. If the grease duct has to travel a long way through the building to reach the roof, or pass through other tenants’ space, costs rise. Equipment hookups (gas, power, water and drains to each piece of equipment) are part of the construction budget. The equipment itself, such as ranges, fryers, refrigeration and dishwashers, is usually purchased separately by the owner or through a kitchen equipment supplier.

Permits and health approvals

In the City of Vancouver, tenant improvements, changes of use, moving walls and relocating plumbing, electrical or gas all require permits. The City issues its own electrical, plumbing, gas and mechanical permits. In other Metro Vancouver cities, Technical Safety BC handles electrical and gas permits unless the city does it locally.

Food premises also need health approval. Vancouver Coastal Health requires floor plans to be reviewed and approved before construction starts. For a 1,200 sq ft restaurant, permits and engineering together typically run $8,000 to $18,000.

Design and engineering

A restaurant renovation needs drawings that the City and health authority will accept. The City’s commercial renovation checklist calls for drawings at a minimum of 1/4 inch scale, engineers as building systems change, and architect Letters of Assurance for larger (Part 3) buildings.

Mechanical engineering for the hood and make-up air, plumbing design for the grease interceptor and fixtures, and sometimes structural engineering for rooftop equipment all add to soft costs. Coordinated drawings cost money up front but prevent much larger change orders during construction.

Finishes (front of house)

The dining room is where owners have the most control. Flooring, wall finishes, ceilings, lighting, banquettes, feature walls and custom millwork can be scaled up or down to match the concept and the budget.

Commercial flooring must handle grease, water and heavy traffic, so the cheapest option is rarely the cheapest over five years.

Accessibility and washrooms

Two accessible washrooms typically cost $25,000 to $50,000. Under the BC Building Code 2024 section 3.8, accessibility rules apply to alterations, and at least one universal washroom is required where washrooms are provided on accessible storeys. Vancouver removed its separate “enhanced accessibility” requirements in 2025 to align with provincial rules.

If existing washrooms are undersized or not accessible, expect to rebuild them. We cover this work in more depth on our accessibility projects page.

Vancouver-specific cost considerations

Restaurant renovations in Vancouver come with local factors that affect both cost and schedule.

  • Older buildings. Many restaurant spaces in Gastown, Chinatown, Mount Pleasant and along Commercial Drive are in older buildings. Expect undersized electrical services, aging drain lines, uneven floors and tight routes for duct work.
  • The 2025 Vancouver Building By-law. Since September 15, 2025, renovations under $255,000 no longer trigger structural or non-structural upgrades, and tenant renovations with no effects outside the suite face narrower upgrade requirements (City of Vancouver VBBL guide). Smaller refreshes may come in under that threshold. Larger ones should budget for possible upgrades.
  • Grease bylaw. Metro Vancouver’s Bylaw 365 sets sizing, maintenance and dishwasher connection rules. An existing interceptor that is too small for your new menu or fixture count will need replacing.
  • Vancouver Coastal Health. The BC Food Premises Regulation says you must not construct or alter food premises until plans are approved. Plan 2 to 8 weeks for review; no official timeline is published.
  • HVAC lead times. At 6 to 12 weeks, equipment delivery can hold up the whole project if ordered late.
  • Landlord rules. Many landlords restrict work hours, require approved trades, specify roof penetration procedures and set insurance minimums. Read your lease before pricing the job.

The City’s free Commercial Renovation Centre also helps small businesses, including restaurants, with suitability checks and department coordination.

Restaurant renovation timeline overview

Cost and schedule are linked: every week a restaurant sits closed or unopened costs rent and lost revenue. As a market guide, design takes about 4 to 6 weeks, City permits 3 to 6 weeks for simple work and 8 to 16 weeks for complex jobs or change of use, health review 2 to 8 weeks (often concurrent), and construction 6 to 14 weeks. From design start to opening, about 4 to 7 months is typical.

Restaurant renovation cost estimator

Use this tool for a quick, rough range. It multiplies your square footage by the typical cost range for your restaurant type, then adjusts for the condition of the space: a second-generation restaurant space is multiplied by 0.85 (existing systems reduce the work), a former retail or office space by 1.0, and a bare shell by 1.2. If you check the boxes, it adds the installed cost of a new Type I hood and suppression system and a new grease interceptor, then adds a 10% contingency to the total.

Estimate your restaurant renovation range

 

Rough planning range only, based on typical 2026 Vancouver market estimates, before GST. Not a quote. Kitchen equipment is not included. For an accurate number, book a free site visit and detailed estimate.

Treat the result as a starting point for a conversation, not a budget. The real number depends on what is behind the walls, above the ceiling and under the slab.

How Suzuki Construction keeps restaurant budgets predictable

We have built and renovated food service spaces for brands like Jinya, Danbo, Blenz Coffee and Veroni Espresso Bar. What we have learned is that most budget overruns start before construction, when assumptions about the space go unchecked.

  • Site assessment first. We check electrical capacity, plumbing rough-ins, HVAC and drainage before pricing, so the estimate reflects the real space.
  • Coordinated permits and drawings. Mechanical, plumbing, structural and fire-rated assemblies, plus health authority compliance, are planned together.
  • Written change orders. No extra work happens without a written change order you approve first. No hidden costs, no jargon.
  • Milestone payments. Progress payments are tied to completed milestones, not the calendar.
  • Daily updates. You get daily progress updates with photos and one point of contact, often the owners themselves.

Schedules matter too. A client review of our Lonsdale Quay Market store in North Vancouver put it simply: “The whole construction lasted 45 days, as scheduled.”

Learn more about our process on our restaurant renovation services page.

Frequently asked questions

How much does a restaurant renovation cost per square foot in Vancouver?

Typical 2026 Vancouver market ranges are about $150 to $320 per square foot for quick-service, $200 to $350 for casual sit-down, $250 to $500 for full-service with a bar, and $500 to $800+ for fine dining. A light cosmetic refresh with no kitchen or mechanical changes can be $75 to $120 per square foot.

Does the renovation cost include kitchen equipment?

Usually not. Construction budgets normally include the hood, fire suppression, grease interceptor and equipment hookups. Cooking equipment, refrigeration and dishwashers are typically purchased separately, so plan a separate equipment budget.

How much does a commercial kitchen hood cost in Vancouver?

A Type I hood with fire suppression typically costs $18,000 to $45,000. A complete system with grease duct, make-up air and suppression runs about $30,000 to $80,000 installed, depending on the duct route and size.

Is it cheaper to renovate a second-generation restaurant space?

Usually, yes. Reusing a working hood, grease interceptor, washrooms and adequate electrical service can save tens of thousands of dollars. Have each system inspected first, because equipment that does not meet current codes or your menu’s needs will still have to be replaced.

How much contingency should I budget for a restaurant renovation?

Plan 10 to 15% of construction cost. Older buildings, change of use projects and spaces with unknown mechanical history should lean toward the higher end.

Do I need Vancouver Coastal Health approval before renovating?

Yes. Under the BC Food Premises Regulation, you must not construct or alter food premises until plans are approved by a health officer. Vancouver Coastal Health reviews floor plans before construction and inspects before you open.

Does the $255,000 Vancouver Building By-law threshold affect my renovation?

It can. Under the 2025 Vancouver Building By-law, renovations under $255,000 no longer trigger structural or non-structural upgrades. Larger projects may need additional upgrades, so confirm early with your designer and contractor.

Get an accurate restaurant renovation estimate

Online ranges only go so far. The fastest way to a reliable number is a site visit by someone who knows restaurant systems. Suzuki Construction offers free consultations and detailed estimates across Vancouver, Richmond, Burnaby, North Vancouver and the rest of Metro Vancouver.

Request your free estimate, call us at (236) 515-7803, or explore our restaurant renovation services in Metro Vancouver.

Leave the first comment